Site Plan & Development Progress

1385 Business Park is being built in phases, and every building is the same quality construction: red-iron steel structure, metal panel walls, black insulated overhead doors, concrete walkways and concrete ADA parking, and stabilized crushed concrete drives and yard. Buildings 1 – 3 are leased, Building 4 is complete and ready for lease now, Building 5 is partially pre-leased, with one of its two suites taken and one suite available now, and Buildings 6 – 9 are pre-leasing now. Construction starts within 60 days of a signed lease, with delivery about four months after construction starts.

Leasing Status

Current Availability

Availability, configurations, and timing may change. Contact the owners for current pricing and options.

Building 4

Four suites of approximately 1,350 SF each; up to approximately 5,999 SF total

Ready for lease now

Available for multiple tenants or one tenant

Building 5, Suites 501 and 502

Approximately 1,750 SF per suite

Partially Pre-Leased

One suite available now. The other suite is pre-leased.

Buildings 6–9

Flexible configurations

Pre-leasing now

Construction starts within 60 days of a signed lease, with delivery about four months after construction starts

Site Plan

The property at a glance

Site plan of the 1385 Business Park property showing the U-shaped building layout with parking and future retail/storage pad
Site plan showing Buildings 1 through 9, the shared yard and parking areas, and the front pad reserved for future retail or storage units.
  • Buildings 1 – 3Leased. Buildings 1 and 2 occupied through Q1 2027, Building 3 and pad leased long term
  • Building 4Four suites of approximately 1,350 SF each, available for multiple tenants or one tenant
  • Building 5Partially pre-leased, one suite available now
  • Buildings 6 – 9Pre-leasing now. Construction starts within 60 days of a signed lease, with delivery about four months after construction starts.
  • Front PadFuture retail / storage, in planning

Phasing

How the park is growing

  1. Phase 1

    Occupied

    Buildings 1 – 3, Leased

    Buildings 1 and 2 are leased and occupied through Q1 2027. Building 3 and its pad are leased long term. Join the waitlist to be first in line when space in these buildings comes available.

  2. Phase 2

    Ready now

    Building 4, Ready for Lease Now

    Completed and ready for lease now with four suites of approximately 1,350 SF each, without mezzanine space. The building has a slab of approximately 5,400 SF and can total up to approximately 5,999 SF for all four suites. It can be leased to multiple tenants or one tenant. The building has a red-iron steel frame, metal panel walls, black insulated overhead doors, concrete walkways, concrete ADA parking, stabilized crushed concrete drives, and a heavy concrete slab, with interiors finished around each tenant's operation.

  3. Phase 3

    Partially pre-leased

    Building 5, Partially Pre-Leased

    One of Building 5 suites 501 and 502 is pre-leased, and one suite is available now. Tenant opportunities also include the completed Building 4 space and the planned Buildings 6 through 9.

  4. Phase 4

    Construction starts within 60 days

    Buildings 6 – 9, Additional New Buildings Planned for 2027

    Additional new buildings are planned for 2027. Reserve space today and construction starts within 60 days of a signed lease, with delivery about four months after construction starts. Same red-iron steel frame, metal panel walls, black insulated overhead doors, concrete walkways, concrete ADA parking, and a heavy concrete slab, with interiors built to suit your workflow.

  5. Future

    In planning

    Front Pad, Future Retail / Storage

    Future phases may include a commercial retail center, self-storage units, or additional commercial flex space fronting FM 1385 as Pilot Point continues to grow.

Progress

Construction updates

Foundation forming

Foundation forming

Formwork, vapor barrier, and reinforcing steel set for the next building slab, engineered for heavy equipment loads.

Slab poured

Slab poured

Finished slab with plumbing stub-outs in place, ready for the red-iron steel frame to be erected.

Building 4 overhead door and walkway

Building 4 overhead door and walkway

Black insulated overhead door, adjacent man door, concrete walkway, and stabilized crushed concrete drive at Building 4.

Building 4 complete

Building 4 complete

Finished Building 4 with metal siding, black insulated overhead doors, concrete walkways, and stabilized crushed concrete drives.

Building entries and ADA parking

Building entries and ADA parking

Evening view of the park’s building entries, exterior lighting, and concrete ADA parking between buildings.

Building 4 interior

Building 4 interior

Completed open shell with red-iron steel framing and concrete slab, ready for tenant-specific office, restroom, mezzanine, insulation, and lighting decisions.